Detroit Water and Sewerage Department
File #: 22-0940    Version: 1 Name:
Type: Contract Status: Passed
In control: Financial Services
On agenda: 10/19/2022 Final action: 10/19/2022
Title: The Board of Water Commissioners for the City of Detroit, Water and Sewerage Department authorizes the Director to approve DWSD Contract No. 6004748 for Patch Material, Bituminous: CP-5 Modified delivered in minimum of 40 Ton Truckloads with Cadillac Asphalt for a total contract amount not-to-exceed $270,000 and a term of one (1) year. The BOWC also authorizes the Director to take such other action as may be necessary to accomplish the intent of this vote.
Indexes: Board of Water Commissioners, Finance Committee

Title

The Board of Water Commissioners for the City of Detroit, Water and Sewerage Department authorizes the Director to approve DWSD Contract No. 6004748 for Patch Material, Bituminous: CP-5 Modified delivered in minimum of 40 Ton Truckloads with Cadillac Asphalt for a total contract amount not-to-exceed $270,000 and a term of one (1) year. The BOWC also authorizes the Director to take such other action as may be necessary to accomplish the intent of this vote.

 

Body

Agenda of October19, 2022

Item No.: 22-0940

Contract No.: 6004748

Contractor: Cadillac Asphalt (DBB), 670 South Dix, Detroit, MI 48217

Contract Amount: $270,000

Contact Term: 11/1/22-10/31/23 (1 year)

 

 

TO:                                          The Honorable

                                          Board of Water Commissioners

                                          City of Detroit, Michigan

 

FROM:                     Gary Brown, Director

                                          Water and Sewerage Department

 

RE:                                          Proposed DWSD Contract 6004748

Patch Material

Cadillac Asphalt

 

MOTION

 

Upon recommendation of Marqaicha Welch, Procurement Manager, the Board of Water Commissioners for the City of Detroit, Water and Sewerage Department authorizes the Director to approve DWSD Contract No. 6004748 for Patch Material, Bituminous: CP-5 Modified delivered in minimum of 40 Ton Truckloads with Cadillac Asphalt for a total contract amount not-to-exceed $270,000 and a term of one (1) year. The BOWC also authorizes the Director to take such other action as may be necessary to accomplish the intent of this vote.

 

BACKGROUND / JUSTIFICATION

 

The Central Warehouse and West Yard’s function is to receive, stock, store and issue materials to various DWSD Departments to support the work of Field Services, Maintenance, Repair, and Operations. Patch material is essential for completion of many DWSD projects. Cold patch (specification #CP-5) is used year around to patch excavation holes on streets and sidewalks made by DWSD during repairs of water and sewer assets and similar service work orders. To support its work, DWSD’s Materials Management team maintains a readily available supply at both the CSF and West Yard warehouses. Cold patch is bid out annually due to the volatile pricing of the petroleum based product. This contract will assure that operations will run smoothly and to replenish stock preventing emergency spot buys and possible work stoppages.

 

PROCUREMENT METHOD

 

This contract was procured through a Request for Bids (RFB) #489443 and was advertised on the Michigan Inter-Governmental Trade Network (MITN) website for 21 calendar days. MITN published this opportunity to 91 companies and 11 firms downloaded the bid package. Two bids were received, and Cadillac Asphalt was the lowest equalized, responsible and responsive bidder.

 

 

 

Bidder

Bid Total

Equalization

Equal. Credits Applied

Equalized Total

Ajax Paving

$276,000

None

None

$276,000

Cadillac Asphalt

$270,000

DBB - 2%

($5,400)

$264,600

 

Cadillac Asphalt clearances expire 4/21/23, and a formal contract document is not required.  Per DWSD procurement protocol, no further approvals are required.

 

 

 

 

SUMMARY

 

A.                     Contract No:                                                                                    6004748

B.                     Contract Term:                                                                                    11/1/22 - 10/31/23 (1 year)

C.                     Contract Amount:                                                               $270,000

D.                     Anticipated FY Spend:                                                               FY 22-23: $180,000

                                                                                                                              FY 23-24: $90,000

E.                     Funding Source:                                                                                    O&M Funds

F.                     GL String:                     5720-00000-000000-150100-000000-00000-0000-000000- 100% Water                                          

 

 

This proposed contract was presented to the BOWC Finance Subcommittee on October 5, 2022.  Per DWSD procurement protocol, no additional approvals are required.