Title
The Board of Water Commissioners for the City of Detroit, Water and Sewerage Department authorizes the Director to approve DWSD Contract 6002986 for Project WS-715 with Lakeshore Global Corporation, for Water Improvements for McNichols Evergreen, Miller Grove, Minock Park, Riverdale, Rosedale Park for a total amount not-to-exceed $9,682,978.08 and a term of 2 years. This also authorizes the Director to take such other action as may be necessary to accomplish the intent of this vote.
Body
Agenda of September 16, 2020
Item No. 20-0223
Contract No. 6002986 (WS-715)
Contractor: Lakeshore Global Corporation
Address: 7310 Woodward Avenue, Suite 500A, Detroit MI 48202
Contract Amount: $9,682,978.08
Contract Term: 730 days (2 years) - anticipated Start Date of April 12, 2021
TO: The Honorable
Board of Water Commissioners
City of Detroit, Michigan
FROM: Gary Brown, Director
Detroit Water and Sewerage Department
RE: Proposed DWSD Contract No. 6002986 / Project No. WS-715
Water Improvements for McNichols Evergreen, Miller Grove, Minock Park, Riverdale, Rosedale Park
Lakeshore Global Corporation
MOTION
Upon recommendation of Mamata Burgi, Procurement Manager, the Board of Water Commissioners for the City of Detroit, Water and Sewerage Department, authorizes the Director to approve DWSD Contract 6002986 for Project WS-715 with Lakeshore Global Corporation, for Water Improvements for McNichols Evergreen, Miller Grove, Minock Park, Riverdale, Rosedale Park for a total amount not-to-exceed $9,682,978.08 and a term of 2 years. This also authorizes the Director to take such other action as may be necessary to accomplish the intent of this vote.
BACKGROUND / JUSTIFICATION
DWSD Project No. WS-715 is part of an ongoing distribution piping system water main replacement program. The work consists of replacing existing 8-inch diameter water mains at selected locations in Detroit that have a history of frequent breaks and high maintenance cost. Lead services forecasted for replacement are 385 and represents 6.5% of the contractor’s bid. The aggregate forecasted length of Lead services being replaced with copper within the public ROW is 10,741 linear feet and 9,785 linear feet on private properties. Additionally, Lead services of one inch and less in diameter are replaced with one-inch copper tube; existing Lead services of 1.5-inches and 2-inches diameter are replaced with copper tube of the same diameter.
This water main replacement contract is one of a continuing series of contracts that replaces or lines the aged water mains in the City of Detroit having an extensive history of leaks and breaks that have also exceeded their intended service life. The new water mains and associated infrastructure will enhance the integrity of DWSD’s Water System and ensure quality service to its customers. To protect the health and safety of our customers, existing Lead (Pb) water services are being replaced with copper in both the right-of-way and from the curb box to the customer water meter.
Proposed Contract 6002986, for Project WS-715, will continue the rehabilitation of water main to provide better services to citizens of Detroit and meet the needs of future City Development.
PROJECT OBJECTIVES / COSTS
The objective of the proposed Project WS-715 is to replace existing 8-inch water mains that have a history of leaks and breaks with approximately 25,586 linear feet of 8-inch water main, including 4,390 linear feet of 8-inch lining, 5,956 linear feet of horizontal directional drilling (HDD), and 8,473 linear feet of pipe bursting. Also, whether the pipe is new DI pipe or HDPE pipe, the work includes replacement of all fittings, valves, and hydrants. Finally, existing Lead water services will be replaced with copper from the water main to the customer meter. The number of Lead services forecasted for replacement through this project is 385 and the Lead water service replacement work represents 6.5% of the contractor’s bid. The aggregate forecasted length of Lead services being replaced with copper within the public ROW is 10,741 linear feet and 9,785 linear feet on private properties. Should additional Lead services be encountered over the course of the work, they shall also be replaced at the rates established in the Bid Schedule.
The water main replacement work is broken down as follows:
Street |
From |
To |
New Ductile Iron Water Main |
|
|
|
8-inch |
12-Inch |
16-Inch |
Burt Road |
Grand River |
McNichols |
58 |
|
|
Auburn Street |
Outer Drive |
Grand River Ave |
394 |
|
|
Minock Street |
Fenkell |
Grand River Ave |
447 |
|
|
Chalfonte Ave. |
Artesian St |
Stahelin Ave |
137 |
|
|
Penrod |
Lyndon Ave |
Eaton Ave |
40 |
|
|
Ridge Rd |
Florence Ave |
Riverdale |
1,151 |
|
|
Bramell St |
Puritan Ave |
McNichols |
452 |
|
|
Puritan Ave |
Beaverland Ave |
Chatham |
111 |
|
|
Lamphere St |
Verne Ave |
Puritan Ave |
450 |
|
|
Dolphin St |
Grove St |
Dehner St |
176 |
|
|
Verne Ave |
Dolphin St |
Lahser |
165 |
|
|
Blackstone St |
Grand River Ave |
Florence |
862 |
|
|
Puritan |
Blackstone St |
Burt Rd |
58 |
|
|
Burt Rd |
Grand River Ave |
Florence St |
190 |
|
|
Pierson St |
Grand River Ave |
Puritan |
1,546 |
|
|
Braile St |
Florence St |
Puritan |
46 |
|
|
Patton St |
Grand River Ave |
Puritan |
195 |
|
|
Southfield Svc Dr |
Lyndon Ave |
Grand River Dr |
124 |
|
|
Lahser Rd |
McNichols Rd |
Grove Rd |
57 |
|
|
Lahser Rd |
Kessler St |
Puritan |
30 |
|
|
Westbrook St |
Verne Ave |
Puritan |
78 |
|
|
|
|
Total: |
6,767 |
0 |
0 |
|
Street |
From |
To |
Lining Existing Water Main |
|
|
|
8-inch |
12-Inch |
16-Inch |
Southfield Svc Dr |
Lyndon Ave |
Grand River Dr |
2,399 |
|
|
Lahser Rd |
McNichols Rd |
Grove Rd |
530 |
|
|
Lahser Rd |
Kessler St |
Puritan |
245 |
|
|
Westbrook St |
Verne Ave |
Puritan |
1,216 |
|
|
|
|
Total: |
4,390 |
0 |
0 |
|
Street |
From |
To |
New Water Main -- HDD |
|
|
|
8-inch |
12-Inch |
16-Inch |
Burt Rd |
Grand River Ave |
McNichols Rd |
675 |
|
|
Chalfonte Ave |
Artesian St |
Stahelin Rd |
276 |
|
|
Puritan Ave |
Beaverland |
Chatham |
470 |
|
|
Lamphere St |
Verne Ave |
Puritan Ave |
1,169 |
|
|
Dolphin St |
Grove St |
Dehner St |
384 |
|
|
Blackstone St |
Grand River Ave |
Florence |
592 |
|
|
Burt Rd |
Grand River Ave |
Florence |
817 |
|
|
Braile |
Florence |
Puritan Ave |
560 |
|
|
Patton |
Grand River Ave |
Puritan Ave |
1,013 |
|
|
|
|
Total: |
5,956 |
0 |
0 |
|
Street |
From |
To |
New Water Main - Pipe Burst |
|
|
|
8-inch |
12-Inch |
16-Inch |
Auburn St |
Outer Drive |
Grand River Ave |
2,937 |
|
|
Minock St |
Fenkell |
Grand River Ave |
1,758 |
|
|
Penrod St |
Lyndon Ave |
Eaton |
730 |
|
|
Bramell St |
Puritan Ave |
McNichols Rd |
2,058 |
|
|
Verne Ave |
Dolphin St |
Lahser |
488 |
|
|
Puritan Ave |
Blackstone St |
Burt Road |
502 |
|
|
|
|
Total: |
8,473 |
0 |
0 |
Project Total Piping: |
25,586 Linear Feet |
This is a State of Michigan Drinking Water Revolving Fund (DWRF) project and Federal requirements must be met for Disadvantaged Business Enterprises (DBE) and Davis-Bacon. With regard to DBE participation, prime contractors who bid on a DWRF-funded water main projects and who intend to use subcontractors must demonstrate good-faith procurement outreach efforts for Disadvantaged Business Enterprises (DBE) during the bidding period, which involves soliciting at least three disadvantaged subcontractors per trade, and documenting these efforts in the DBE forms found in the DWRF portion of the bid document specifications. The DBE forms and supporting documents were included in the successful bidder’s package in order to comply with DWRF program requirements.
PROCUREMENT METHOD
This contract was procured through a Request for Bids (RFB) per Requisition #478277 and was advertised on the Michigan Inter-Governmental Trade Network (MITN) website for 33 calendar days. MITN published this opportunity to 1,415 companies and 122 firms downloaded the bid package.
The Engineer’s Estimate for this work is $12,017,382.02. Six (6) bids were received:
Bidder |
Total Bid Price |
Equalizations |
Equalization Credits |
Equalized Bid Total |
Lakeshore Global Corp. |
$9,682,978.08 |
N/A |
$0.00 |
$9,682,978.08 |
L. D'Agostini & Sons |
$9,951,465.00 |
N/A |
$0.00 |
$9,951,465.00 |
Bricco Excavating Co |
$10,658,950.00 |
N/A |
$0.00 |
$10,658,950.00 |
Major Cement Co. |
$11,964,846.00 |
N/A |
$0.00 |
$11,964,846.00 |
Bidigare Contractors, Inc |
$12,283,053.00 |
N/A |
$0.00 |
$12,283,053.00 |
Murphy Pipeline Contractors, Inc. |
$13,974,455.00 |
N/A |
$0.00 |
$13,974,455.00 |
Although Lakeshore global is located in Detroit, their DBB certification expired on 6/19/2020; therefore, equalization credits were not applied.
Based on the information above, it is recommended that the contract be awarded to the lowest equalized responsive and responsible bidder, Lakeshore Global Corporation.
Lakeshore’s clearances expire on 10/29/2020 and they have submitted all required forms, bonds and signed the contract.
SUMMARY
A. Contract No.: 6002986
B. Contractor: Lakeshore Global Corporation
C. Contract Term: 730 days (2 years) anticipated start date of April 12, 2021
D. Contract Amount: $9,682,978.08
E. Fiscal Year Breakdown: FY 20-21: $2,500,000.00
FY 21-22: $6,000,000.00
FY 22-23: $1,182,978.08
F. Funding Source: State of Michigan Revolving Drinking Water Fund
G. GL String: 5721-20244-487711-617900-900319-30129-0000-000000 - 100%
This proposed contract was presented to the DWSD Finance Committee on September 2, 2020. Per the DWSD Procurement Policy, Post-FRC review will also be obtained.